Calortec Oy manufactures prefabricated boiler plants and other special heating equipment
The personnel has years of experience in supplying boilers and boiler plants to home market and abroad following the ISO9001 Quality Management System considering the environmental issues.
The prefabricated boiler plants are ready built at our factory including the electrical installation work
and FAT test. Delivery time and commissioning time on site will be minimum and the operation of the system is reliable.

Main products
Prefabricated CALORTEC-SLK boiler plant oil / HVO / gas / electric
Prefabricated boiler plants are designed according to the customer’s needs and wishes and are built in our factory.
|
Product |
Capacity |
|---|---|
|
District heating |
1,0 – 50,0 MW |
|
Steam |
1,0 – 35,0 t/h |
|
Thermal oil |
0,5-10,0 MW |

Special pressure vessels according to Client´s drawings
|
Product |
|---|
|
Heat pump plants |
|
Heat recovery boilers |
|
Second hand /maintained boiler plants water/ steam |
|
District heating accumulator load-/ unloading pumping stations |

In co-operation with company Danstoker (Denmark):
|
Product |
Capacity |
|---|---|
|
Water boilers: biogas, LNG, LPG, light oil, (HVO) |
1,0-30 MW |
|
Steam boilers: biogas, LNG, LPG, light oil, (HVO) |
1,0-35 t/h |
|
Electric boilers: water/ steam |
0,5-6 MW |

Our operating principle – individually designed tailor made turn key deliveries
- Design
- Project management
- Manufacturing in own factory
- Material delivery of high quality components
- Transportation
- Approval process
- Local works ie. installation, testing, start up and training
- Documentation in the language of the destination country
- After sales service
- Maintenance
“Boiler business can be global, but turnkey boiler plant deliveries must be local.”

SATISFACTION GUARANTEED
Each project will begin from blank white paper, which is filled with Client´s needs and requirements individually tailor-made.

